Facilities

Our facilities and equipment allow us to offer large production volumes with maximum quality

From laboratories to production plants, we have cutting edge equipment

Three high performance factories in strategic locations

45,000 m² designated for raw materials and finished products in order to provide a rapid response to any request

12 in-house plants to work alongside our clients

With these, we bring part of our production process to our clients’ packaging line. This saves up to 90% in transport and reduces our carbon footprint.

We have the best location to accompany your company's growth. Let's talk!

Contact
CAIBA Ribarroja

Our most modern facilities, with the most advanced machinery in the sector and a privileged geographic situation.

Headquarters and corporate administration.

  • Mould workshop and quality control lab. 

  • 22,196 m2 

  • 110 M packaging/year 

  • 850 M preforms/year 

  • PET, rPET

CAIBA Alcala

Located in the largest area of olive oil production in the world, it has injection and blowing machines with one and two phases.

  • Mould workshop and quality control lab. 

  • 20,401 m2 

  • 150 M packaging/year 

  • 600 M preforms/year 

  • PET, rPET

CAIBA Toledo

This is our most recent plant, specialised in high density polypropylene and polyethylene, a material that completes our range. The processes are based on extrusion and blowing of packaging.

  • Mould workshop and quality control lab. 
  • 9,148 m2 
  • 46 M packaging/year 
  • PE, PP

With the accumulated know-how and an innovative team, we approach every project with guarantees of success

Discover integral management